Dream Maker Headwall at Killington Ski Resort
Advanced · 309 m long with 115 m of vertical, averaging 20° and 27° at its steepest, facing E.
27°steepest 50 m
20°average pitch
309 mlength
115 mvertical
1089 mtop elevation
Efaces
Snow and sun
Dream Maker Headwall is east-facing: morning sun, softens first and shades by early afternoon.
How to get to Dream Maker Headwall
Lifts that reach the top: Skye Peak Express Quad (skiing novice terrain to get there); Skyeship Express Gondola Stage 2 (skiing easy terrain to get there); Superstar Express Six (skiing easy terrain to get there).
From the base area (about 10 minutes, advanced skiing needed):
- Ride Skyeship Express Gondola Stage 1
- Ride Skyeship Express Gondola Stage 2
- Ski Great Eastern (easy)
- Ski Dream Maker Headwall (advanced)
Where it ends
Joins The North Way, Thimble, unnamed intermediate trail. Nearest lifts from the bottom: Needle's Eye Express Quad (3 min), Northbrook Quad (4 min), Bear Mountain Quad (4 min).
See Dream Maker Headwall on the 3D mapAll runs at Killington Ski ResortMeasured from OpenStreetMap geometry and elevation via OpenSkiMap (ODbL). Times are rough. Grades, grooming and openings change day to day — check the resort's own reports.