Snow Guide
Snow GuideMyoko Suginohara Ski ResortRuns › Shianoki Trail

Shianoki Trail at Myoko Suginohara Ski Resort

Easy · 1111 m long with 237 m of vertical, averaging 12° and 18° at its steepest, facing SE.

18°steepest 50 m
12°average pitch
1111 mlength
237 mvertical
1288 mtop elevation
SEfaces

Snow and sun

Shianoki Trail is south-east-facing: sun from mid-morning, softens early in spring.

How to get to Shianoki Trail

Lifts that reach the top: 杉ノ原第3リフトA線・B線 (skiing easy terrain to get there); 杉ノ原第3リフトA線・B線 (skiing easy terrain to get there); 杉ノ原ゴンドラ (skiing easy terrain to get there); 杉ノ原ゴンドラ (skiing easy terrain to get there); 三田原第2高速リフト (skiing easy terrain to get there); 第4リフトA線・B線 (skiing easy terrain to get there).

From the base area (about 5 minutes, easy skiing needed):

  1. Ride 杉ノ原ゴンドラ
  2. Ski Shirakaba Trail (easy)
  3. Ski Shianoki Trail (easy)

Where it ends

Joins Shirakaba Trail, unnamed easy trail. Nearest lifts from the bottom: 杉ノ原第2リフトA線・B線 (1 min), 杉ノ原第2リフトA線・B線 (1 min), 杉ノ原第2ロマンスリフト (3 min).

See Shianoki Trail on the 3D mapAll runs at Myoko Suginohara Ski Resort
Measured from OpenStreetMap geometry and elevation via OpenSkiMap (ODbL). Times are rough. Grades, grooming and openings change day to day — check the resort's own reports.