Snow Guide
Snow Guide › Myoko Suginohara Ski Resort › Runs › スーパージャイアント, Super Giant Trail

スーパージャイアント, Super Giant Trail at Myoko Suginohara Ski Resort

Advanced · 1026 m long with 320 m of vertical, averaging 17° and 37° at its steepest, facing SE.

37°steepest 50 m
17°average pitch
1026 mlength
320 mvertical
1856 mtop elevation
SEfaces

Snow and sun

スーパージャイアント, Super Giant Trail is south-east-facing: sun from mid-morning, softens early in spring.

Grooming: mogul. Moguls.

How to get to スーパージャイアント, Super Giant Trail

Lifts that reach the top: 三田原第3高速リフト (skiing novice terrain to get there).

From the base area (about 7 minutes, advanced skiing needed):

  1. Ride 杉ノ原ゴンドラ
  2. Ski Shirakaba Trail (easy)
  3. Ski Park Connection (easy)
  4. Ride 三田原第3高速リフト
  5. Ski スーパージャイアント, Super Giant Trail (advanced)

Where it ends

Joins Shakunage Trail. Nearest lifts from the bottom: 三田原第3高速リフト (3 min), 第4リフトA線・B線 (4 min), 第4リフトA線・B線 (4 min).

See スーパージャイアント, Super Giant Trail on the 3D mapAll runs at Myoko Suginohara Ski Resort
Measured from OpenStreetMap geometry and elevation via OpenSkiMap (ODbL). Times are rough. Grades, grooming and openings change day to day — check the resort's own reports.