Snow Guide
Snow GuideRevelstoke Mountain ResortRuns › Critical Path

Critical Path at Revelstoke Mountain Resort

Intermediate · 2413 m long with 1389 m of vertical, averaging 17° and 30° at its steepest, facing W.

30°steepest 50 m
17°average pitch
2413 mlength
1389 mvertical
2225 mtop elevation
Wfaces

Snow and sun

Critical Path is west-facing: afternoon sun, softens late and can crust as it refreezes.

How to get to Critical Path

Lifts that reach the top: The Stoke (skiing novice terrain to get there); Revelation Gondola - Upper (skiing easy terrain to get there); unnamed magic carpet (skiing easy terrain to get there); Stellar (skiing easy terrain to get there); The Ripper (skiing intermediate terrain to get there).

From the base area (about 25 minutes, intermediate skiing needed):

  1. Ride Revelation Gondola - Lower
  2. Ride Revelation Gondola - Upper
  3. Ski unnamed easy trail (easy)
  4. Ski The Last Spike (easy)
  5. Ride The Stoke
  6. Ski Critical Path (intermediate)

Where it ends

Joins The Last Spike, Lightning Rod. Nearest lifts from the bottom: Little Bit (1 min), The Stoke (2 min), Revelation Gondola - Upper (10 min).

See Critical Path on the 3D mapAll runs at Revelstoke Mountain Resort
Measured from OpenStreetMap geometry and elevation via OpenSkiMap (ODbL). Times are rough. Grades, grooming and openings change day to day — check the resort's own reports.