Snow Guide
Snow GuideRevelstoke Mountain ResortRuns › Critical Path Glades

Critical Path Glades at Revelstoke Mountain Resort

Expert · 6538 m long with 592 m of vertical, averaging 7° and — at its steepest, facing W.

steepest 50 m
average pitch
6538 mlength
592 mvertical
1584 mtop elevation
Wfaces

Snow and sun

Critical Path Glades is west-facing: afternoon sun, softens late and can crust as it refreezes.

Grooming: backcountry. Tree skiing (gladed). Ungroomed, off-piste character.

How to get to Critical Path Glades

Lifts that reach the top: Revelation Gondola - Upper (skiing easy terrain to get there); unnamed magic carpet (skiing easy terrain to get there); Stellar (skiing easy terrain to get there); The Stoke (skiing easy terrain to get there); The Ripper (skiing intermediate terrain to get there).

From the base area (about 18 minutes, expert skiing needed):

  1. Ride Revelation Gondola - Lower
  2. Ride Revelation Gondola - Upper
  3. Ski unnamed easy trail (easy)
  4. Ski The Last Spike (easy)
  5. Ski Critical Path Glades (expert)

Where it ends

Joins The Last Spike, Kill The Banker. Nearest lifts from the bottom: Revelation Gondola - Upper (3 min), Little Bit (3 min), Revelation Gondola - Lower (9 min).

See Critical Path Glades on the 3D mapAll runs at Revelstoke Mountain Resort
Measured from OpenStreetMap geometry and elevation via OpenSkiMap (ODbL). Times are rough. Grades, grooming and openings change day to day — check the resort's own reports.