Snow Guide
Snow GuideWasatch Peaks RanchRuns › Critical Path

Critical Path at Wasatch Peaks Ranch

Intermediate · 275 m long with 69 m of vertical, averaging 12° and 18° at its steepest, facing E.

18°steepest 50 m
12°average pitch
275 mlength
69 mvertical
2443 mtop elevation
Efaces

Snow and sun

Critical Path is east-facing: morning sun, softens first and shades by early afternoon.

How to get to Critical Path

Lifts that reach the top: Diamond Peak (skiing intermediate terrain to get there).

From the base area (about 16 minutes, intermediate skiing needed):

  1. Ride Diamond Peak
  2. Ski Diamond Dollar (intermediate)
  3. Ski Central Park (intermediate)
  4. Ski Critical Path (intermediate)

Where it ends

Joins Central Park. Nearest lifts from the bottom: Diamond Peak (6 min), South Pointe (6 min), Acorn (7 min).

See Critical Path on the 3D mapAll runs at Wasatch Peaks Ranch
Measured from OpenStreetMap geometry and elevation via OpenSkiMap (ODbL). Times are rough. Grades, grooming and openings change day to day — check the resort's own reports.